Skip to content
  • Reconstructed 2026-07-27 by /audit-kb-os — [web-deploy-issues](/core/_workingon/tasks/web-deploy-issues/) was listed in Tasks/_active.md as an open task (“all three issues fixed; awaiting Talbot’s deploy + device verification”) but no task file existed at that path.
  • git history found one prior file at this exact path, closed and deleted 2026-06-26 (commit 5547d9e, “close web-deploy-issues — pipeline fixes + log”) with a completion log at Core/IT/Logs/2026-06-26_web-deploy-pipeline-fixes.md. That log covers 6 fixes (UAC prompt, stale PWA, broken wikilinks, MBR homepage 404, Core site silent CF failure, Bases blocks not rendering) — a different shape than “three issues… device verification.”
  • Two possibilities, can’t tell which from the vault alone: (a) the _active.md line is a month-old leftover that should have been removed when the June 26 task closed, and there’s no real open work here; or (b) this describes a genuinely separate, more recent round of web-deploy fixes (maybe the specific “three issues” are a subset, or a newer PWA/device-testing round) that was tracked only in _active.md prose and never got its own file.
  • Talbot: is this the same June 26 work (line is stale — safe to close/remove) or a distinct newer thread (needs real content)?

Recreated as a stub to fix a RED finding from /audit-kb-os. Did not guess which of the two scenarios above is true — the June 26 closure log doesn’t cleanly match the “three issues / device verification” wording in _active.md, so conflating them risks losing or misrepresenting real status either way.

Summary:

  • File created so [web-deploy-issues](/core/_workingon/tasks/web-deploy-issues/) resolves
  • Real status — ambiguous, needs Talbot’s call

Next Steps for Talbot:

  • Say which it is: stale leftover (I’ll close/remove this file + the _active.md line) or real newer work (tell me what the three issues were) *