Strategies-Library — Status
Section titled “Strategies-Library — Status”Type: Ongoing project (KB-native)
Owner: SDC/IP dept (SVP-IP, A1)
Home: SDC/IP/Projects/Strategies-Library/ — portal: DASHBOARD
Current state
Section titled “Current state”- 32 strategies in
SDC/IP/Strategies/, across 10group/folders. Schema v0.5.strategy-lint lintclean. - Viewer (
library-view.html) working: Risk ladder (default) + Worth It (4×4 effort × benefit matrix), audience filter row, brand entity + Inter font. Worth It positions are still placeholders — bannered in the page — untileffort/benefitare set. - Generated files are read-only (
chmod 444, which also sets the Windows read-only attribute, so Obsidian cannot save over them). - Market Drop Wins (MDW) fold-in: session 1 of 3 done — the 7 debt strategies added and 5 overlaps reconciled. Not-debt, Harmful / Not Worth It, and practice-tier sets remain → sdc-ip-mdw-strategy-foldin.
- ⚠ Open compliance gap: the Risks filter
risk-level >= 2misses two level-1 borrowing strategies (rrsp-gross-up-loan, non-callable-first). Both are routed to Risks by hand until a second criterion is settled. See SCHEMA §2.3.
Active tasks
Section titled “Active tasks”| Task | State | Command |
|---|---|---|
| sdc-ip-mdw-strategy-foldin | active: session 1 of 3 done, 5 Next Steps waiting on Talbot | /task-continue D:\FSS\KB\SDC\IP\Projects\Strategies-Library\Tasks\sdc-ip-mdw-strategy-foldin.md |
Tracked here but owned by other depts. They stay in their own dept, and this project only links to them:
sdc-risks-canada-leverage-compliance(SDC/Risks,active): the Risk-Challenger review of the risk axis, the §2.4 rewording, and the level-1 filter gap.sdc-behavioural-solutions-debt(SDC/Strategy,ready, blocked onsdc-dept-scaffold-mbr-absorb): settles SCHEMA §2.4’s intervention ceilings.sdc-strategy-library-v01(SDC/Strategy,active): superseded by the move toSDC/IP. Three Strategy-side items remain, then it closes.
Recently done
Section titled “Recently done”- 2026-09-23: Origin task
SMART-DEBT-Strategies-Libraryclosed (9 rounds).Talbot-Later.mdwas folded into ROADMAP (Waiting on Talbot), ROADMAP’s## Nowis piloted, and the first lesson was recorded. The SMTM continuation design was spun out to KB-OS-ongoing-project-continuation. - 2026-09-23: Task upgraded to this ongoing project. Library renamed to the plural $MART DEBT Strategies Library everywhere it is a living name. The generator was changed and the outputs regenerated. The fold-in task moved in here, and
Talbot-Later.mdwas folded into ROADMAP’s Waiting on Talbot section. Log:SDC/IP/Logs/2026-09-23_Strategies-Library-Task-to-Ongoing-Project.md - 2026-09-22: MDW fold-in session 1, which brought the library from 25 to 32 strategies and the schema to v0.5 (
d96f0fb,d0f0787). Viewer finalised: brand font, axis labels, Labels toggle, and the CEO’s §2.4 wording (8768286). - 2026-09-21:
SDC/IPdept created and the library moved fromSDC/Strategy/Library. Schema went from v0.2 to v0.4 (signedrisk-level, simplification), the library became an OKF bundle, group subfolders were added, and the viewer’s first version shipped (d62df8e→df8f55f).
Key files
Section titled “Key files”DASHBOARD.md(portal) ·ROADMAP.md(including Waiting on Talbot) ·UPGRADES.md·LESSONS.md