KB-OS — Roadmap
Section titled “KB-OS — Roadmap”Summary: Evolve the unified KB from a stable structure into a department-based OS that Talbot initiates and scoped AI agents execute — toward increasing levels of autonomous assistance. Type: Ongoing (no end state; milestones below; checkboxes track progress)
Active task: KB-OS-dept-inference-routing (M4). KB-OS-okf-evaluation closed 2026-09-23 as don’t adopt, and its thread moved to SDC (sdc-ip-drop-stale-after).
/task-start D:\FSS\KB\Core\Processes\Projects\KB-OS\Tasks\KB-OS-dept-inference-routing.md
Also open: KB-OS-re-focus-sdc · Obsidian-Upgrades-Phase2-Verification · frictionless-docs-links
M1 — Foundation ✅
Section titled “M1 — Foundation ✅”- Department-first unified vault (Core / MBR / SDC / FSS)
- KB-OS audit + stale-link cleanup (2026-06-20)
M2 — Dept + Ongoing-Project layer ✅
Section titled “M2 — Dept + Ongoing-Project layer ✅”- Processes dept chartered (
JOB_DESCRIPTION.md) - AI dept chartered (
Core/AI/JOB_DESCRIPTION.md) - IT dept chartered + monorepo pilot stood up (
Core/IT/, 2026-06-25) - Ongoing-project model defined; pilots stood up (KB-OS, ai-config, monorepo)
- Ongoing-Projects registry created
- Director Staff files (Processes/AI/IT) — drafted 2026-07-06
M3 — SMTM v5.2 ✅ (v5.4 shipped 2026-07-08: smart Templater wizard + auto-registration; v5.7 shipped 2026-08-31: Continuation Gate)
Section titled “M3 — SMTM v5.2 ✅ (v5.4 shipped 2026-07-08: smart Templater wizard + auto-registration; v5.7 shipped 2026-08-31: Continuation Gate)”- Continuation Gate — no task or project closes without a resolved successor (2026-08-31)
- Ongoing-Project as first-class construct
- Dept-based task routing rule +
dept:frontmatter - ONE master tracker grouped by dept
-
requires_approval:field (A1 gate)
M3.5 — Agent layer v1 ✅ (2026-07-09)
Section titled “M3.5 — Agent layer v1 ✅ (2026-07-09)”-
/task-start+/task-continueauto-load the dept charter chain (JOB_DESCRIPTION → Staff → project STATUS) -
Agent-Team.mdroster — org chart, autonomy levels, “expanding the team” checklist - Vault-wide Biggest Rocks table on
Core/DASHBOARD.md(curated roll-up)
M3.6 — Memory & Context layer ⬜ (in progress)
Section titled “M3.6 — Memory & Context layer ⬜ (in progress)”- Memory v1 — CONSTITUTION Principle #8, qmd recall, SessionEnd digest hook, auto-memory promotion (2026-07-13)
- Context System doc —
KB-OS-Context.md(tool map, benefits-by-audience, ai-config cross-link) - CodeGraph — code-dev recall, CLI-first (whole monorepo indexed) (2026-07-13)
- Memory Phase 3 — SessionStart inject hook — done 2026-07-13 per STATUS
- graphify high-quality full-vault re-run — done 2026-07-13 per STATUS
- Deferred (not committed): hybrid-query speed, transcript bootstrap import — see UPGRADES
- Detail + rationale: KB-OS-Context
M4 — Intake + automation ⬜
Section titled “M4 — Intake + automation ⬜”-
/triage-inboxskill — shipped with Ideas-Workflow P2, 2026-07-17 - Dept-aware
/task-complete— logs →<dept>/Logs/shipped (Step 6A). Dept CHANGELOG dropped: a dept’sLogs/already is its dated history. Lessons stay project/global. Project trackers covered by SMTM v5.9 Step 7b. Talbot, 2026-09-23 - SMTM skills resolve dept
Tasks/folders (task-start/-continue/-complete/-prep, 2026-06-25) - Dept inference/auto-routing in
/task-start+/task-from-chat(write to correct folder, setdept:) - Idea-capture workflow: Web Clipper → single intake → routed (see
Tasks/idea-capture-workflow.md) - Migrate
Core/Logs/→<dept>/Logs/ - MBR content consolidation — done 2026-07-09 per STATUS; — origin-story-safe, archive-with-wikilinks (see
Tasks/mbr-content-consolidation.md)
M4.5 — Obsidian-native upgrades ⬜ (from Automation Guide clipping, 2026-08-25)
Section titled “M4.5 — Obsidian-native upgrades ⬜ (from Automation Guide clipping, 2026-08-25)”- Phase 1: buy (Obsidian Starter Kit) vs piecemeal decision — verdict piecemeal, 4-round evaluation in
Tasks/archive/(task closes to archive after this round). Scored candidates:UPGRADES.md. -
Related-Tasks.base/Related-Notes.basebuilt — native Bases, two-tag discovery pattern, no plugin - Kanban Action Planner installed + WBS-hierarchy tested against
ecco-notepads-build(Tasks/Obsidian-Upgrades-Phase2-Verification.md) - Dataview Serializer installed + tested against
ecco-view.jsoutput (same task) - Obsidian CLI installed — also the candidate mechanism for AI-side visual verification of future Obsidian UI changes (WSL reachability unconfirmed)
M5 — Rules system ⬜
Section titled “M5 — Rules system ⬜”-
ai-config-rules-upgradeproject — all 4 phases done 2026-07-16 per ai-config ROADMAP M2; (CLAUDE.md de-dup → AGENTS.md SSOT → dept/agent layer)
Future Upgrades
Section titled “Future Upgrades”- See UPGRADES for the full ideas parking lot